1. | Location | Road from Sardar Bridge to R.T.O. | 2. | River/Nala/Creek | Fly Over Bridge | 3. | Lane | Two lane | 4. | Year of construction | 1997 | 5. | Cost | Rs.704.73 Lacs | 6. | Details of Bridge |
|
| Length of Bridge | 692.12 (single lane) + 156.8 mtr. (double lane) |
| (ii) Number of span | 19+5+2+17+6+2+14 |
| (iii) Span Length | Dumas side - 17x11.2 +6x22.4+2x10.63 |
|
| City side - 19x11.2+x22.4+12.02+9.22 |
| (iv) Carriage Way | 4.9 mtr. single lane and 7.5 mtr. double lane. |
| (v) Length of Returns | R.T.O.side 68.00 mtr. |
Construction of Fly over Bridge on varachha road part of S.H. 169, at Surat | (Longest Four Lane Fly-Over in India, within City Limit) | | |
| (A) General Details :- | 1. | Name of work | Construction of Fly-over Bridge on Varachha road part of S H 169, at Surat. | 2. | Estimated Amount | Rs. 27,21,70,749.85 | Sanctioned By. | General Board Res. No.327/00 dtd.17-05-00 | 3. | Tender Amount | Rs. 26,94,76,259.43(for main fly-Over) Rs. 1,83,00,000.00 (for addl. ramp at Hirabaug.) | Sanctioned By. | Rs. 28,77,76,259.43 (Total) Standing Committee Res.No.1331/01 Dt. 01-12-01. | 4. | Time Limit | 24 month Up To 31-12-2003 (25-12-01 to 31-12-03) | 5. | Expenditure | Rs. 29,50,00,000.00 | 6 | Name of Contractor | M/s Ranjit Construction Co, Mehsana | |
|
0 Comments:
Post a Comment